Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 30 results ...

Abdelaty, A F A (2017) Data-driven algorithms for enhanced transportation infrastructure asset management, Unpublished PhD Thesis, , Iowa State University.

Al Shalabi, F A (2016) BIM framework for energy and maintenance performance assessment for facility management, Unpublished PhD Thesis, , Iowa State University.

AlBughdadi, A J M (2022) Advanced decision support tools for bridge asset management, Unpublished PhD Thesis, , Iowa State University.

Azmy, N (2012) The role of team effectiveness in construction project teams and project performance, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Barbosa Resende, C (2021) Post-construction evaluation for work zones and construction engineers' training, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Barutha, P J (2018) Integrated project delivery for industrial projects, Unpublished PhD Thesis, , Iowa State University.

  • Type: Thesis
  • Keywords: alliancing; business development; collaboration; complexity; disputes; healthcare; infrastructure project; innovation; integration; integrated project delivery; performance; productivity; public infrastructure; project stakeholder; stakeholders; efficienc
  • ISBN/ISSN:
  • URL: https://dr.lib.iastate.edu/handle/20.500.12876/30729
  • Abstract:
    Industrial capital projects are risky business ventures with increasing size, uncertainty, and complexity that frequently experience growth in cost and time to deliver, and oftentimes do not achieve their desired performance results. From Merrow (2011), “65% of all industrial projects fail to meet business objectives.” The misuse of capital project funds and resources does not provide a stable foundation for sustainable business development in the industrial sector to stay competitive in the global market. The adversarial environment created from the risk shedding structure of current project delivery methods not only impedes the performance of industrial projects but can also stifle innovation and create inefficiencies in the industrial project development sector. Industrial capital project delivery has suffered from stunted growth in productivity and broad industry innovation while seeing an increase in claims and disputes for a number of years dating back to the 20th century. Integrated project delivery (IPD) in the healthcare industry in the United States and alliance contracting on public infrastructure projects in Australia and New Zealand have proven to effectively use enhanced collaboration and integration strategies and methods to bring value for money to the overall project. Using the principles of IPD and alliancing can be a way to deliver industrial projects with more active collaboration of participants and with higher levels of integration of project stakeholders to reduce the probability of failed projects and to create a better environment of innovation and efficiency leading to a more efficient use of the industry's available resources. The dissertation aims to contribute to the body of knowledge by evaluating the use of increased integration and collaboration by applying the principles of IPD and alliancing in the industrial capital projects sector. The results of an industry-wide survey indicate industrial projects can benefit from implementing IPD and alliancing strategies with nearly all (98%) survey participants responding that more collaboration and integration increases overall project value for money on industrial projects. Thus, the research seeks to test the hypothesis; Increased integration and collaboration by implementing IPD and alliancing principles can lead to better project performance and increase the probability of successfully achieving its business case objectives on an industrial project. The research findings provide evidence to suggest industrial project performance is improved by increased collaboration and integration, demonstrating that industrial projects are good candidates for an IPD delivery. The findings also provide guidance to effectively structure project delivery with the right balance of IPD and alliancing collaboration and integration principles to enhance industrial project performance and achieve important business objectives. Finally, the research will propose an IPD framework for industrial projects, defining the principles and methods, as well as their expected impact and it will also report on barriers to implementation of this delivery method on an industrial project.

Canales Fernandez, A R (2004) Developing effective integration between American supervisors and hispanic craft workers in construction, Unpublished PhD Thesis, , Iowa State University.

Christensen, A N (2019) Identifying private construction project owner inefficiencies that affect project goals, Unpublished PhD Thesis, , Iowa State University.

El-adaway, I H (2008) Construction dispute mitigation through multi-agent based simulation and risk management modeling, Unpublished PhD Thesis, , Iowa State University.

Elmisalami, T E (2001) Developing a multi-attribute utility model (MAUM) for selecting information technologies in the construction industry, Unpublished PhD Thesis, , Iowa State University.

Enz, D L (2009) Construction project administration and management for mitigating work zone crashes and fatalities: An integrated risk management model, Unpublished PhD Thesis, , Iowa State University.

Gad, G M (2012) Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts, Unpublished PhD Thesis, , Iowa State University.

Gao, Z (2004) Investigation of technologies to improve the visualization of design documents and construction process, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Harmelink, D J (1995) Linear scheduling model: The development of a linear scheduling model with microcomputer applications for highway construction project control, Unpublished PhD Thesis, , Iowa State University.

Kaewmoracharoen, M (2009) Feasibility of visualization and simulation applications to improve work zone safety and mobility, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Kawal, D E (1970) A systems model of a construction firm, Unpublished PhD Thesis, , Iowa State University.

Lueth, P L O (2008) The architectural design studio as a learning environment: A qualitative exploration of architecture design student learning experiences in design studios from first- through fourth-year, Unpublished PhD Thesis, , Iowa State University.

Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML), Unpublished PhD Thesis, , Iowa State University.

McCann, M (1986) An application of convex programming to construction scheduling, Unpublished PhD Thesis, Industrial and Manufacturing Systems Engineering, Iowa State University.

Mohd Zainudin, N (2019) Identification and analysis of worker safety hazards in Midwest agribusiness construction work sites, Unpublished PhD Thesis, Agricultural and Biosystems Engineering, Iowa State University.

Nahvi, A (2019) Integrated stochastic economics performance evaluation of horizontal infrastructure systems, Unpublished PhD Thesis, , Iowa State University.

Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods, Unpublished PhD Thesis, , Iowa State University.

Rahbar, F (1997) Computer-aided parametric planning (CAPP), Unpublished PhD Thesis, , Iowa State University.

Rueda-Benavides, J A (2016) Indefinite delivery/indefinite quantity project selection framework using stochastic techniques, Unpublished PhD Thesis, , Iowa State University.

Shrestha, K P (2016) Data analytics and visualization for enhanced highway construction cost indexes and as-built schedules, Unpublished PhD Thesis, , Iowa State University.

Sirotiak, T L (2008) The effect of problem/project-based learning on a desired skill set for construction professionals, Unpublished PhD Thesis, , Iowa State University.

Smadi, O G (2000) Knowledge-based expert system pavement management optimization, Unpublished PhD Thesis, , Iowa State University.

Talbot, J (2021) Understanding housing reconstruction in Puerto Rico after hurricanes Irma and Maria, Unpublished PhD Thesis, , Iowa State University.

Tapia, R M (2017) Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Woldesenbet, A (2014) Highway infrastructure data and information integration & assessment framework: a data-driven decision-making approach, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.